1. Foundation: Foundation is the most important part of the building.
Building activity starts with digging the ground for foundation and then
building it. It is the lower most part of the building. It transfers the load
of the building to the ground. Its main functions and requirements are:
(a) Distribute the load from the structure to soil evenly and safely.
(b) To anchor the building to the ground so that under lateral loads
building will not move.
(c) It prevents the building from overturning due to lateral forces.
(d) It gives level surface for the construction of super structure.
2. Plinth: The portion of the wall between the ground level and the ground
floor level is called plinth. It is usually of stone masonry. If the foundation
is on piles, a plinth beam is cast to support wall above floor level. At the
top of plinth a damp proof course is provided. It is usually 75 mm thick
plain concrete course.
The function of the plinth is to keep the ground floor above ground level,
free of dampness. Itsheight is not less than 450 mm. It is required that
plinth level is at least 150 mm above the road level, so that connections to
underground drainage system can be made.
3. Walls and Columns: The function of walls and columns is to transfer
the load of the structure vertically downwards to transfer it to foundation.
Apart from this wall performs the following functions also:
(a) It encloses building area into different compartments and provides
privacy.
(b) It provides safety from burglary and insects.
(c) It keeps the building warm in winter and cool in summer.
4. Sills, Lintels and Chejjas: A window frame should not be directly
placed over masonry. It is placed over 50 mm to 75 mm thick plain
concrete course provided over the masonry. This course is called as sill.
Lintels are the R.C.C. or stone beams provided over the door and window
openings to transfer the load transversely so as to see that door or window
frame is not stressed unduly. The width of lintels is equal to the width of
wall while thickness to be provided depends upon the opening size.
Chejja is the projection given outside the wall to protect doors and
windows from the rain. They are usually made with R.C.C. In low cost
houses stone slabs are provided as chejjas. The projection of chejja varies
from 600 mm to 800 mm. Sometimes drops are also provided to chejjas
to improve aesthetic look and also to get additional protection from sun
and rain.
5. Doors and Windows: The function of a door is to give access to
different rooms in the building and to deny the access whenever
necessary. Number of doors should be minimum possible.
The size of the door should be of such dimension as will facilitate the
movement of the largest object likely to use the door.
Windows are provided to get light and ventilation in the building. They
are located at a height of 0.75 m to 0.9 m from the floor level. In hot and
humid regions, the window area should be 15 to 20 per cent of the floor
area. Another thumb rule used to determine the size and the number of
windows is for every 30 m3 of inside volume there should be 1 m2
window opening.
6. Floors: Floors are the important component of a building. They give
working/useful area for the occupants. The ground floor is prepared by
filling brick bats, waste stones, gravel and well compacted with not less
than 100 mm sand layer on its top. A lean concrete of 1 : 4 : 8, 100 mm
thick is laid. On this a damp proof course may be provided. Then floor
finishing is done as per the requirement of the owner.
Cheapest floor finish for a moderate house is with 20 to 25 mm rich mortar
course finished with red oxide. The costliest floor finish is mossaic or
marble finishing.
Other floors are usually of R.C.C. finished as per the requirements of the
owner.
7. Roof: Roof is the top most portion of the building which provide top
cover to the building. It should be leak proof.
Sloping roof like tiled and A.C. sheet give leak proof cover easily.​

👇
Ответ:
gigeriti28391vlad
gigeriti28391vlad
28.06.2022

попробуйте брать по одному предложению с начала,середины и конца

Объяснение:

вот

4,5(13 оценок)
Открыть все ответы
Ответ:
madina123452
madina123452
28.06.2022
Hello, Grandfather Frost! Happy Holidays! Please! Give us all this, the Russian winter! Suppose finally that there will be snow-drifts. Freeze all the water! And the snow mound more! So our children could, and we with them:), sledding, ice skating. Thanks for all the gifts that you gave me!

Здравствуй, Дедушка Мороз! С наступающим праздником тебя! Подари нам всем настоящую, русскую зиму! Пусть наконец то появятся сугробы. Заморозь все водоемы! И снега насыпь побольше! Чтоб смогли наши детки и мы с ними:) , кататься на санках, на коньках за все подарки, которые ты мне подарил!
4,4(51 оценок)
Ответ:
mgatron
mgatron
28.06.2022
Одной из самых знаменательных дат в период правления испанских католических монархов было 12 октября 1492: открытие Америки христофором Колумбом.

Тот факт, что Христофор Колумб (который не был изначально испанский) обратилась в иностранный суд, чтобы предложить свои услуги оказалось, что открытие Америки не было неожиданным.

Португалия и Испания были хорошо продвинутый в освоении заморских меркантильные маршруты и Севилья, богатый испанский город, был тогда важным торговым центром. Мы знаем, что африканские маршруты были закрыты в Испанию в пользу Португалии. В 1479 году, Альфонс V Португалия признала права Испании Канарских островов, в то время как Испания ^признаны права Португалии над Азорские острова, Кабо-Верде и Мадейре.

Канарские острова были отличным плацдармом для альтернативных маршрутов. Единой Испании в 1492 обладал мощной военной машины, стабильная Экономика, и военно-морской опыт, в том числе на разведку торговых путей и заметный научно-технический потенциал математиков, географов, астрономов и судостроителей, которые были сформированы в тигель из трех культур: евреи, мусульмане и христиане. Его единственным соперником был его соседом, Португалия, которая, как мы знаем, должен был положить конец испанской экспансии в Африке.

Колумб предложение было принято быстро, но во время своего путешествия в Азию его каравеллы неожиданно наткнулся на американском континенте.

Испанцы были особенно хорошо подготовлены по истории завоевать, занять, заселить и эксплуатировать новые земли и осваивать новые люди. Америка, таким образом, стал новый рубеж-земля для этих людей использовали его пути и с военными, дипломатами и административных оружия в их распоряжении, чтобы решать задачу. К середине 16-го века, они расселились в двух самых важных viceroyalties, Мексики на Атлантическом, и на Тихоокеанском Перу.
4,4(91 оценок)
Новые ответы от MOGZ: Английский язык
logo
Вход Регистрация
Что ты хочешь узнать?
Спроси Mozg
Открыть лучший ответ